Proposal — Summit Ridge K-8 Addition
To: Douglas County School District · Value: $7.4M · Delivery: CM/GC
Why Ridgeline
- 6 completed K-12 projects in occupied campuses, zero lost-time incidents
- Summer-critical scheduling: our two-shift enclosure plan guarantees dry-in before fall term
- Transparent GMP: open-book buyout, 100% of buyout savings return to the district
Approach highlights
Phased construction with full separation of construction and student circulation; all deliveries scheduled outside arrival/dismissal windows; background-checked workforce badging.
Fee
Preconstruction: $28,500 · CM fee: 4.25% · GCs capped at 9.8%